Search

Agile Tip of the Day, 5 April 2021

Some of the differences between Acceptance Criteria and Definition of Done are that the first is at micro level, different for each product backlog item and about doing the right thing while the latter is at macro level, the same for the different PBIs and about doing the thing right.

#agile #agiletipoftheday #scrum #agiltraining #scrumtraining #acceptancecriteria #agilecoahing #scrummaster #agilegames #agileplanning #agilestandards #definitionofdone

0 views0 comments

Recent Posts

See All

Agile Tip of the Day, 6 June 2021

Must I go to production every sprint? The result of every sprint is an increment which is potentially shippable software. Potentially shippable or releasable does not mean that it needs to be release

Agile Tip of the Day, 05 June 2021

What to do if the sprint is not at the end but all the work has already been done? In that case, new items may be added to the sprint backlog during the sprint as long as it does not endanger the spri